Sener H2SKID
News

Sener moves forward with the design of the 1.25 MW AEM stack for the H2SKID project.

As part of the development of next-generation electrolysis technologies, Sener has taken a key step forward in the engineering and advanced design of an AEM stack that can be scaled up to 1.25 MW, building on the upscaling of a previous 50 kW design developed as part of the IPCEI project.

To do so, the team has conducted/produced:

  • a fluid-thermal-mechanical-electrical modelling of the stack;
  • CFD simulations of the unit cell; and
  • an advanced design of gas-liquid separators for larger stacks.

These advances reinforce Sener’s engineering capabilities to support technology developers in the industrial scale-up of high-power AEM electrolysers, contributing to the development of more efficient, durable and competitive solutions for the production of renewable hydrogen.

Source: Sener

If you want to receive the weekly newsletter, fill in the form.

I'm agree with privacy policy
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.